Article Library

This archive is a compilation of articles published in our eMagazine since inception. The articles are organized by "Subject". Many thanks to those who have contributed to this archive and continue to help it grow by submitting their thoughts and expertise to the magazine.

Wind Energy - Systems

Click on the Article Title to view the article. To find more articles by the same author or company, click the author or company name.

Article Title Author Company eMag Issue Article Synopsis
Design Race in Wind Turbine Drivetrains Aedan Kernan Leonardo Energy

Apr 2011

The game is on. We will know in 2015 if the industry is likely to narrow down to one clear winning design, or whether there remain many routes to the same destination.
Technical Due Diligence of the Fuhrländer 1.5 MW Wind Turbine Charlotta Norén SGS Group

Aug 2009

AAER Wind Energy have partnered with Fuhrländer to manufacture the Fuhrländer 1.5 MW wind turbine on a license in Canada. To identify and minimize technical risks in the process of buying 1.5 MW wind turbines manufactured by AAER, Sky Power Corp, Canada's leading independent renewable energy company awarded the contract to SGS to carry out Technical Due Diligence for the wind turbine technology.
THE FUTURE OF WORLD WIND POWER Izosimov Evgeniy

Feb 2008

The only way to raise wind loading on the blade in the vertical turbine with a horizontal axis, without causing their destruction and worsening their aerodynamic quality, is increase in quantity of blades and a fastening their ends by a ring in a shape of an airfoil.
Wind Energy Collection using Contra-Rotation A F Stobart

Apr 2007

Contra-rotation, using two rotors one behind the other, driving the two halves of an electrical generator. Thus creating a true "Wind Turbine".
Wind-Diesel Systems Sven Ruin AF-Industri & System AB

Apr 2003

Making a hybrid power system work in the long run is not just about buying and installing the equipment. Like with any other technical system, there must be adequate documentation of the installation. Operators and maintenance personnel must have proper training. Funds must be allocated for maintenance and repair, e.g. to replace a worn-out battery bank or hire a specialist for troubleshooting.

Back To Article Topic Index

Search For Articles




Alternative Energy Partners and Sponsors

 

 

More Technical eMagazine from LJB